Rooftop Solar Success Stories from Bangladesh

Factories, cold stores, universities, government offices and homes that have already gone solar — what they installed, how they paid for it and what they report getting back.

Updated

Industrial / RMG

Trishal, Mymensingh

Akij Ceramics

18.69 MWp · Inaugurated March 2026 · Akij Bashir Group

One of the largest IDCOL-financed rooftop systems in the country. 10 MWp of it is connected to the grid under net metering.

Yearly generation
19,500 MWh
Project cost
Tk 101.47 crore
IDCOL loan
Tk 76.83 crore
CO₂ avoided
14,626 t a year
Financing
IDCOL loan, from a KfW facility
Net-metered
Yes

Sources: TBS News, March 2026 (opens in a new tab) · New Age, March 2026 (opens in a new tab)

Anwara, Chattogram

Youngone, Korean EPZ

16 MW at launch, since expanded · First phase inaugurated June 2021 · Youngone Corporation

Bangladesh's largest industrial rooftop system, spread across the roofs of the garment and footwear factories in the Korean Export Processing Zone and expanded in phases.

Daily generation
120–140 MWh
First-phase cost
$16 million
Financing
Self-financed (CAPEX)
Net-metered
Yes

Note: Reported capacity has grown with each phase: 37 MWp (Daily Star, September 2025) and 44 MW (Daily Star, April 2026).

Sources: TBS News, June 2021 (opens in a new tab) · The Daily Star, September 2025 (opens in a new tab) · The Daily Star, April 2026 (opens in a new tab)

Kaliganj, Gazipur

Ha-Meem Group Industrial Park

4.4 MWp · Commissioned July 2024 · Ha-Meem Design Ltd

Part of the garment group's rooftop rollout across its factories. The system covers about four hours of the park's daily power needs.

Cost
About Tk 19.6 crore, including a Tk 3.1 crore grant
Financing
Self-financed, with a grant from an environmental upgrade programme
Installer
FloSolar Solutions
Net-metered
Not stated

Note: The Daily Star puts the cost of the group's whole 12.2 MWp rollout at about Tk 54 crore, with about Tk 7 crore in grants.

Sources: The Daily Star, 2024 (opens in a new tab) · Textile Focus (opens in a new tab)

Rupganj, Narayanganj

Comptex Bangladesh

3.2 MWp · In commercial operation since January 2022 · Robintex Group

An early OPEX project. The textile mill paid nothing upfront: Joules Power owns and runs the system and sells the mill its electricity.

Expected yearly generation
3.7 GWh
Generated by the operator's count
9.1 GWh since 2022
Financing
OPEX — 20-year power purchase agreement; IDCOL lent to Joules Power
Installer
Joules Power (owner and operator)
Net-metered
Yes

Sources: Joules Power project page (opens in a new tab) · Bangladesh Post, 2020 (opens in a new tab) · Bangladesh Post, 2023 (opens in a new tab)

Savar, Dhaka

Hatil Complex

2.67 MWp · Generating since February 2023 · Hatil

The furniture maker financed a multi-megawatt factory rooftop system through IDCOL.

Project cost
Tk 14.23 crore
Financing
IDCOL loan
Net-metered
Not stated

Source: TBS News (opens in a new tab)

Kaliakoir, Gazipur

NAFA Apparels

234 kWp · In operation; work began September 2023

The first site of an energy service company set up with a fashion brand's owner. The factory buys the solar power at a rate below the grid tariff.

Expected yearly generation
287 MWh
Share of the factory's energy
20%
Financing
OPEX — energy service company co-founded by SOLshare and Heartland, Bestseller's owner
Installer
Greener Garments Initiative
Net-metered
Not stated

Note: SOLshare's 2023 annual report gives the size as 227 kWp.

Sources: Bestseller (opens in a new tab) · SOLshare Annual Report 2023 (opens in a new tab)

Habiganj

Far East Spinning

1.1 MWp · Inaugurated November 2018

One of the first IDCOL-financed rooftop systems, connected under the original 2018 net-metering guideline.

Financing
IDCOL loan for 80% of the cost, at 6%
Net-metered
Yes

Source: Dhaka Tribune, November 2018 (opens in a new tab)

Commercial

Sadarghat, Chattogram

Rancon cold storage

296 kWp · In operation since April 2026 · Rancon Sea Fishing Division

482 panels on about 28,000 sq ft of roof cover almost all of the fish cold store's daytime demand on sunny days, and the surplus goes to the grid. There is no battery.

Monthly bill
Tk 6.72 lakh → Tk 2.59 lakh
Monthly saving
About Tk 4.13 lakh
Cost
About Tk 1.3 crore
CO₂ avoided
About 210 t a year
Financing
Not stated
Installer
Rancon Infrastructure and Engineering
Net-metered
Yes

Source: TBS News, May 2026 (opens in a new tab)

Mirsarai, Chattogram

Asian Paints Bangladesh, Mirsarai plant

850 kWp · Inaugurated June 2026

A paint plant that went solar with no upfront cost, buying the power from the installer under an OPEX deal.

Expected yearly generation
About 1 million kWh
Financing
OPEX
Installer
Solaric
Net-metered
Not stated

Note: Figures come from the installer's announcement.

Source: Textile Focus, June 2026 (opens in a new tab)

Institutional

Dhaka

BUET campus

Up to 3.5 MW across 19 buildings · Launched June 2024 · Bangladesh University of Engineering and Technology

The first university in Bangladesh to put solar on all of its rooftops, without spending its own money.

Yearly savings
Tk 50 lakh
Savings over 25 years
Tk 12 crore
Share of campus demand
About 10%

“We will be able to reduce at least Tk 12 crore electricity bills in the next 25 years.”

— BUET pro-vice-chancellor, at the launch
Financing
IDCOL-financed OPEX — no cost to BUET
Installer
PSL Environment and Green Energy, Genex Infrastructure, Pacific Solar and Renewable Energy
Net-metered
Yes

Note: Reports give the capacity as 3.5 MW peak or 2.4 MW generating; SREDA lists the systems separately.

Sources: The Daily Star, June 2024 (opens in a new tab) · TBS News, June 2024 (opens in a new tab)

Jashore

Jashore University of Science and Technology

1 MW · Listed by SREDA as completed December 2025

The university rents out its roofs, buys the solar power at a discount and exports what it doesn't use.

Power price
26.6% below the grid tariff
Roof rent earned
Tk 2 per sq ft a month
Exported to the grid
24,000–38,000 units a month
Financing
OPEX, with an IDCOL loan from IFC funds
Installer
Super Star Renewable Energy (investor and installer)
Net-metered
Yes

Sources: Prothom Alo English, July 2026 (opens in a new tab) · SREDA renewable energy database, system #9055 (opens in a new tab)

Agargaon, Dhaka

Biniyog Bhaban (BIDA headquarters)

150 kWp · Operating by June 2026

BIDA provides the roof; the utility DESCO pays for and runs the system. BIDA takes 10% of the power, and DESCO keeps 90% and any carbon credits.

Generation
About 15,000 units a month
Yearly earnings
Tk 14–15 lakh
Expected payback
3.5 years
CO₂ avoided
150–180 t a year
Financing
OPEX under the National Rooftop Solar Programme
Installer
DESCO (investor and operator)
Net-metered
Not stated

Note: BSS reports an investment of about Tk 50 lakh; BIDA's announcement gives Tk 89 lakh to install plus Tk 87 lakh for 20 years of maintenance.

Sources: BSS, June 2026 (opens in a new tab) · BIDA, September 2025 (opens in a new tab)

Sirajganj

Deputy Commissioner's Office, Sirajganj

150 kW · Net-metered from July 2026

At the inauguration, the minister said the government would replicate the "Sirajganj model" on public buildings elsewhere.

Cost
Tk 71.26 lakh
Financing
Government-funded, through the Cabinet Division
Installer
Pristine Crossing Point, with technical support from NESCO
Net-metered
Yes

Sources: BSS, July 2026 (opens in a new tab) · Energy Bangla (opens in a new tab)

Residential

Mirpur, Dhaka

A Dhaka apartment

2 kW, with batteries · Reported July 2026

The owner installed a small battery-backed system to rely less on the grid, and plans to add another 3 kW.

Cost
Tk 2.7 lakh
Monthly bill
Tk 4,000–4,500 before; about Tk 2,500 lower after
Financing
Not stated
Net-metered
Not stated

Source: Prothom Alo English, July 2026 (opens in a new tab)

How we choose these stories

We include a project only if it is in operation and at least one credible source — national news, the owner, a lender or SREDA's renewable energy database — documents it. Figures are copied from those sources, not calculated, so a story without a savings figure means we haven't found one published.

We leave out claims we can't check, and figures that look implausible for Bangladeshi rooftops. Installer announcements are labelled as such. Run your own numbers with the payback calculator.