Three numbers decide your size

The right system is the smallest of three limits: how much electricity you use, how much shade-free roof you have, and your sanctioned load, which caps the size under net metering. Work out each one, and the lowest is your answer.

Estimate your system size

Enter your numbers below, or read on to see how each limit is worked out.

System size estimator

Average of your last 12 bills
After water tanks and stair rooms
Printed on your bill
Suggested system size4.0 kWpLimited by your electricity use.
Covers your yearly use
4.0 kWp
Fits your roof
6.0 kWp
Net-metering limit
5.0 kWp

Rule-of-thumb estimate, rounded down to the nearest 0.5 kWp. An installer's site survey will confirm shading, roof strength and the exact layout. Estimate the payback for this size.

1. Your electricity use

Your bill shows the units (kWh) you used each month. Add up the last 12 months — or average them — because use in Bangladesh swings sharply between seasons, peaking when ACs and fans run through the hot, humid months.

Then divide your yearly units by how much each kWp of panels produces in a year:

Sizing to cover your whole year is a sensible ceiling. A system that produces much more than you use mostly exports, and the value of those extra units depends on how your utility credits exports.

2. Your shade-free roof

Allow about 100 square feet of shade-free roof per kWp. That covers the panels themselves plus gaps between rows and walkways for cleaning.

When you measure, leave out anything that blocks the sun for part of the day:

  • Water tanks, stair rooms and lift machine rooms
  • Parapet walls on the south side, which shade the first row
  • Areas shaded by taller neighbouring buildings or trees
  • Space you need to keep clear for access, drying clothes or future building work

3. Your sanctioned load

Sanctioned load is the maximum load, in kW, your utility has approved for your connection. It is printed on your electricity bill. Under the 2025 net-metering guideline, your system can be up to 100% of your sanctioned load, and both single-phase and three-phase connections are eligible.

If this turns out to be your smallest limit and you have roof space to spare, ask your distribution utility whether you can apply to increase your sanctioned load. The net-metering guide covers the application in detail.

A worked example

A family in Dhaka with a single-phase connection:

LimitTheir numbersSize it allows
Electricity use450 units a month on average → 5,400 a year, ÷ 1,3504.0 kWp
Roof space600 sq ft shade-free, ÷ 1006.0 kWp
Sanctioned load5 kW on the bill, 100% allowed5.0 kWp

Their electricity use is the smallest limit, so a 4 kWp system is the right starting point — roughly eight to ten panels, depending on panel wattage.

Sizing for factories and RMG

The same three limits apply, with a few extra checks:

  • Daytime load. Factories that run during daylight use most of their solar power directly, which is usually worth more than exporting it. Your hourly load profile matters more than your monthly total.
  • Roof strength. Tin-shed roofs need a structural check — the condition and age of the sheets, purlin spacing and how much extra weight the frame can take.
  • Three-phase supply. Larger systems connect at three-phase, and your sanctioned load is often much higher than a home's.
  • Financing. Industrial systems are a large investment; IDCOL and some banks finance rooftop solar for businesses.

See how other factories sized their systems in our success stories.

Common sizing mistakes

  • Sizing on one summer bill. It overstates your year. Use 12 months.
  • Ignoring shade. A bigger system on a partly shaded roof can produce less than a smaller one in full sun.
  • Going over your sanctioned load. A system above 100% of it won't qualify for net metering under the 2025 guideline.
  • Forgetting future use. If you plan to add ACs or an electric vehicle, tell your installer — it may be worth leaving space or choosing an inverter you can expand.

With a size in mind, see what it costs and how quickly it pays back in cost and payback.