The short version
Solar panels on your roof turn sunlight into direct current (DC) electricity. An inverter converts it into the same 230-volt alternating current your sockets use. Your home or factory uses that solar power first, and anything left over flows out to the grid through a net meter, which your utility credits against your bill.
- 1PanelsTurn sunlight into DC electricity
- 2InverterConverts DC to 230 V AC
- 3Your buildingUses solar power first
- 4Net meter ↔ gridExports surplus, imports the rest
Nothing changes about how you use electricity. Lights, fans, ACs and machines draw power the same way — they simply take less from the grid while the sun is up.
The parts of a rooftop system
A typical grid-connected system in Bangladesh has five parts. Each is worth asking your installer about.
| Part | What it does | Ask your installer |
|---|---|---|
| Panels (modules) | Convert sunlight into DC electricity. | Brand, model and wattage; mono or bifacial; warranty terms. |
| Inverter | Converts DC to AC, monitors output and shuts down safely when the grid fails. | Grid-tied or hybrid; warranty length; whether you can see output on your phone. |
| Mounting structure | Holds panels at the right angle and keeps them in place in storms. | Galvanised steel or aluminium; height above the roof; wind rating. |
| Cabling and protection | Carries power safely, with fuses, breakers, surge protection and earthing. | Cable sizes; lightning and surge protection; where the isolators are. |
| Net meter | Records units imported from and exported to the grid. | Whether the quote includes the net-metering application and meter. |
Grid-tied, hybrid or off-grid?
Grid-tied (on-grid)
Panels and an inverter connected to the grid, with no batteries. This is the simplest and cheapest option, and the one net metering is designed for. Its one drawback in Bangladesh: it switches off during power cuts.
Hybrid
A grid-connected system with batteries. It can keep selected circuits — lights, fans, a fridge, a server room — running during outages. It costs noticeably more, and batteries wear out and need replacing well before the panels do.
Off-grid
Panels and batteries with no grid connection at all, like the solar home systems used across rural Bangladesh. Useful where there is no reliable grid, but it cannot use net metering and needs a much larger battery bank.
What happens during load-shedding
When the grid goes down, a grid-tied inverter stops within a fraction of a second, even on a sunny day. This is called anti-islanding, and it is a safety requirement: it stops your panels from feeding power into lines that utility workers expect to be dead. Power returns automatically when the grid does.
If backup matters to you, you have two choices: a hybrid system with batteries, or keeping your existing backup. Many Bangladeshi homes already have an IPS; ask your installer how a new solar system would work alongside it before you buy.
Sun, monsoon and haze
Bangladesh gets strong sunshine for much of the year, which makes rooftop solar a good fit — but output changes with the seasons:
- Dry season (roughly February to May) brings the clearest skies and the highest output.
- Monsoon (roughly June to September) brings heavy cloud. Panels keep working from diffuse light, but daily output falls on overcast days.
- Winter fog and haze cut output on many mornings, and dust builds up on panels in the dry months, so regular cleaning matters.
Averaged across a year, a well-placed system produces roughly 3.5 to 4 units (kWh) per day for each kWp installed. Our payback calculator starts from 1,350 units per kWp per year, a figure you can change to match an installer's estimate for your site.
Which way panels should face
Bangladesh is in the northern hemisphere, so panels collect the most energy facing south. A tilt of roughly 20–25° — close to the country's latitude — gives the best yearly total for a fixed system. On factory roofs, panels usually follow the roof's own slope; east- and west-facing panels still work, with somewhat lower output.
Shade is the biggest enemy. On Dhaka rooftops the usual culprits are water tanks, stair rooms, parapet walls, dish antennas and taller neighbouring buildings. Even a shadow across part of one panel can drag down a whole string, so a good installer will map shade across the day before drawing a layout.
Where net metering fits in
Under Bangladesh's 2025 net-metering guideline, single- and three-phase consumers can connect a system of up to 100% of their sanctioned load. Units you export are recorded by the net meter and set against the units you import. The net-metering guide walks through eligibility and the application step by step.
Next, work out how big your system should be in sizing your system.