Skip to content
Figures refreshed quarterly · Last verified
SolarGreenBD

The Bangladesh solar reference

Go solar in Bangladesh with every fact in one place.

Compare verified solar installers, understand the 2025 net-metering rules and see real rooftop results — sourced, dated and written in plain language.

Start with your question

Three ways in, depending on who you are and what you are deciding.

  • Homeowners

    What will rooftop solar cost me, and when does it pay back?

    Sizing, prices and a payback calculator built on the 2025 net-metering rules.

    Open the payback calculator →
  • Factory & RMG owners

    Is my factory eligible for net metering and IDCOL financing?

    Eligibility, the application process and case studies from industrial rooftops like yours.

    Read the net-metering guide →
  • Solar installers

    How do I get my company in front of buyers?

    Listings come from SREDA's net-metering records, free of charge. See how to get listed or update your profile.

    How listing works →

For homeowners and factories

What does rooftop solar pay back in Bangladesh?

Enter your system size, tariff and sanctioned load to see a first estimate of savings and payback under net metering. Then compare it with real installer quotes.

  • Capped at 100% of your sanctioned load, per the 2025 guideline
  • Single- and three-phase connections are both eligible
  • Change the cost and generation assumptions to match your quotes
Find installers with a SREDA track record →

Payback calculator

2025 net metering
From your electricity bill
Printed on your bill
Adjust assumptions
Payback4.8 years
Yearly savings৳67,500
Upfront cost৳3,25,000

Estimate only. Generates about 6,750 kWh a year, with every unit — used or exported — valued at your tariff. Real savings depend on your roof, shading and how your utility credits exported units.

Pillar guide · Last verified

The 2025 net-metering guideline, explained

Bangladesh revised its net-metering rules in 2025. Here is what changed and how to apply — checked against SREDA's National Solar Help Desk (opens in a new tab).

  • Single- and three-phase connections are eligible
  • Systems up to 100% of your sanctioned load
  • Apply online and get paid for leftover credit every quarter
Read the full guide
  1. 1

    Check eligibility

    Confirm your connection type and sanctioned load on your electricity bill.

  2. 2

    Size your system

    Match panel capacity to your roof and yearly consumption.

  3. 3

    Choose a verified installer

    Compare listings by district, system type and experience.

  4. 4

    Submit your application

    Apply on the Power Division's net-metering portal. Your utility inspects the site and decides within 10 working days.

  5. 5

    Install, inspect and connect

    Install within 8 months. The utility checks the system and signs the net-metering agreement within 15 working days.

Find a solar installer with a track record

Every company listed has net-metered rooftop systems recorded in SREDA's national database, ranked by what SREDA records — nobody pays to be listed.

Browse all 30 installers →
  1. 2

    Omera Renewable Energy

    SREDA: 31.748 MWp · 20 projects

    East Coast Group's rooftop solar company. Clients can buy a system outright, pay in instalments, or buy the power under a 20-year agreement.

    Average job
    1.59 MWp per project
    Serves
    Commercial & industrial · Institutional
    Offers
    Design & installation · OPEX / no upfront cost
    Group
    East Coast Group
  2. 3

    Super Star Renewable Energy

    SREDA: 18.859 MWp · 29 projects

    Super Star Group's solar company, founded in 2013, selling solar products and building rooftop systems.

    Average job
    650 kWp per project
    Head office
    Tejgaon, Dhaka
    Serves
    Residential · Commercial & industrial · Institutional
    Offers
    Design & installation · Operation & maintenance
    Group
    Super Star Group

Bangladesh solar policy, in the order it happened

All government policies →
  1. 2018

    First net-metering guideline

    Rooftop owners can export surplus solar power to the grid.

  2. 2025

    Renewable Energy Policy 2025

    Targets 20% of power demand from renewables by 2030 and 30% by 2040, replacing the 2008 policy.

  3. 2025Current

    Net Metering Guideline 2025

    Systems up to 100% of sanctioned load, with leftover credit paid out every quarter.

  4. 2026

    Tk 10.50 export incentive

    Systems installed by February 2027 earn Tk 10.50 for each unit exported, until February 2030.

Policy changes, the week they happen

New guidelines, SREDA notices and fresh success stories. One email, only when something changes.