AC (alternating current)
The kind of electricity in your sockets and on the national grid — 230 volts at 50 hertz in Bangladesh. An inverter converts the DC from solar panels into AC.See also: DC (direct current), Inverter
Anti-islanding
A safety feature in grid-tied inverters that shuts the system down when the grid goes off, so no power flows into lines that workers expect to be dead. It is why a standard grid-tied system gives no backup during load-shedding.See also: Grid-tied system (on-grid), Load-shedding

B

BERC
Bangladesh Energy Regulatory Commission — the regulator that sets electricity tariffs, including the slab rates on your bill.
Bi-directional meter (net meter)
A meter that records both the units you import from the grid and the units your solar system exports to it. Net metering needs one.See also: Net metering
Bifacial panel
A panel that collects light on both faces, gaining extra output from light reflected off the roof below. Most common on large industrial systems.
Bulk rate
The tariff BERC sets for the electricity a distribution utility buys in bulk. Under the 2025 net-metering guideline, credit left at the end of a settlement period is paid out at this rate, which is usually lower than the retail rate on your bill.See also: Settlement period, BERC

C

Capacity utilisation factor (CUF)
A system's actual yearly generation as a share of what it would produce running at full rated power every hour of the year. Used to compare how well systems perform.See also: Specific yield
CAPEX model
Owning your solar system outright: you pay for it upfront or with a loan, and keep all the savings and net-metering payouts.See also: OPEX model

D

DC (direct current)
The kind of electricity solar panels and batteries produce. It must be converted to AC before your home or the grid can use it.See also: AC (alternating current), Inverter
Degradation
The slow loss of a panel's output as it ages, usually a fraction of a percent each year. A performance warranty sets the most a panel is allowed to lose.See also: Performance warranty
Distribution utility
The company that supplies power to your premises and sends your bill — for example BPDB, DPDC, DESCO, BREB (through its Palli Bidyut Samitis), WZPDCL or NESCO. Net-metering applications go through your utility.

E

Earthing (grounding)
Connecting a system's metal parts to the ground so faults and lightning surges have a safe path away from people and equipment. Essential on Bangladeshi rooftops, which see frequent storms.
EPC
Engineering, procurement and construction — a company that designs, supplies and installs a complete system. Most installers in our directory work as EPCs.
Export
Units your system sends to the grid when it produces more than your home or factory is using at that moment.See also: Import, Net metering

G

Grid-tied system (on-grid)
A solar system connected to the grid without batteries. It is the simplest and cheapest kind, and the kind net metering is designed for, but it switches off during power cuts.See also: Anti-islanding, Hybrid system

H

Hybrid system
A grid-connected system with batteries, so it can keep selected loads running during outages. It costs more than a grid-tied system, and the batteries need replacing during the system's life.See also: Grid-tied system (on-grid), Off-grid system

I

IDCOL
Infrastructure Development Company Limited — a government-owned financial institution that funds renewable energy in Bangladesh, from rural solar home systems to industrial rooftop solar.See also: Solar home system (SHS)
Import
Units you take from the grid — at night, or when your load is larger than what your panels are producing.See also: Export
Inverter
The box that converts DC from your panels into AC for your home and the grid. It also monitors the system and handles safety shutdowns.See also: String inverter, Microinverter
IPS
Instant power supply — the battery backup unit many Bangladeshi homes use during load-shedding. It is separate from a solar system unless your installer designs them to work together.

K

kW (kilowatt)
A rate of power: 1,000 watts. Your sanctioned load and an appliance's rating are measured in kW.
kWh (unit)
A quantity of energy — one kilowatt used for one hour. The "units" on your electricity bill are kWh.
kWp (kilowatt peak)
A solar system's rated output under standard test conditions. Systems are sized and priced in kWp; a 5 kWp system might be ten to twelve panels.

L

Load-shedding
Planned power cuts when demand exceeds supply. A grid-tied solar system switches off during them; a hybrid system can keep running.See also: Anti-islanding, Hybrid system

M

Microinverter
A small inverter fitted behind each panel instead of one central inverter, so shade on one panel does not drag down the rest. It costs more per kWp.See also: String inverter
Monocrystalline panel
A panel made from single-crystal silicon cells. Dark in colour and more efficient than polycrystalline panels, it is now the most common choice for rooftops.See also: Polycrystalline panel
Mounting structure
The frame that holds panels at the right angle. On flat concrete (RCC) roofs it is usually a raised steel frame; on tin-shed factory roofs, panels are clamped to rails fixed to the roof sheets.

N

Net metering
An arrangement where the units you export are credited against the units you import, so you are billed for the difference. Under Bangladesh's 2025 guideline, 90% of net exports become credit, and credit left at the end of each settlement period is paid out.See also: Bi-directional meter (net meter), Sanctioned load, Settlement period

O

Off-grid system
A solar system with batteries and no grid connection, such as the solar home systems used in rural areas. It cannot use net metering.See also: Solar home system (SHS)
OPEX model
A third-party arrangement where an investor company installs, runs and maintains a solar system on your premises at its own cost, and you buy the electricity it produces at an agreed rate, usually below your utility's tariff.See also: CAPEX model

P

Payback period
How many years of savings it takes to cover what you paid for the system. Upfront cost divided by yearly savings.
Peak sun hours
The number of hours a day that sunlight averages 1,000 watts per square metre — a simple way to express how much solar energy a place receives.See also: Specific yield
Performance warranty
A manufacturer's promise that a panel will still produce a set share of its rated output after a number of years, commonly 25. Separate from the product warranty, which covers defects.See also: Degradation
Polycrystalline panel
A panel made from multi-crystal silicon cells, recognisable by its blue, speckled look. Cheaper but less efficient than monocrystalline.See also: Monocrystalline panel

R

RE accounting meter (solar accounting meter)
A meter that records what your solar system generates, including its highest monthly output. The 2025 net-metering guideline requires one on every net-metered system, alongside the net meter.See also: Bi-directional meter (net meter)

S

Sanctioned load
The maximum load, in kW, your utility has approved for your connection. It is printed on your bill. Under the 2025 guideline a net-metered system can be up to 100% of it.See also: Net metering
Settlement period
The three months over which net-metering credit builds up, ending with the March, June, September and December bills. At the end of each one, leftover credit is paid out at the bulk rate and the balance resets to zero.See also: Net metering, Bulk rate
Shading
Anything that blocks sunlight from the panels — a water tank, stair room, tree or taller building. Even partial shade can cut a panel's output sharply.
Single-phase / three-phase
Types of grid connection. Most homes are single-phase; larger buildings and factories are usually three-phase. Both are eligible for net metering under the 2025 guideline.
Solar home system (SHS)
A small off-grid kit — panel, battery and lights — used widely in rural Bangladesh, many financed through IDCOL.See also: IDCOL, Off-grid system
Specific yield
Yearly generation per kWp installed, in kWh per kWp. It lets you compare sites and quotes; our payback calculator starts from 1,350 kWh per kWp.See also: Peak sun hours, Capacity utilisation factor (CUF)
SREDA
Sustainable and Renewable Energy Development Authority — the government agency that promotes renewable energy in Bangladesh and runs the National Solar Help Desk.
String inverter
One central inverter fed by "strings" of panels wired together. The most common and cost-effective choice for unshaded roofs.See also: Microinverter

T

Tilt angle
The angle of the panels from horizontal. In Bangladesh, south-facing panels tilted at roughly 20–25° — close to the country's latitude — capture the most energy over a year.