The short version
Bangladesh wants a fifth of its electricity from renewable sources by 2030, and most of that will be solar. For anyone with a roof, four sets of rules matter:
- The Net Metering Guideline 2025 lets you connect a system of up to 100% of your sanctioned load and get paid for leftover credit.
- A December 2025 circular makes rooftop solar a condition of many new connections and load increases.
- A September 2026 incentive pays Tk 10.50 for each unit exported from systems installed by 28 February 2027.
- The Renewable Energy Policy 2025 sets the national targets and the tax breaks behind them.
National targets and progress
The Renewable Energy Policy 2025 sets the headline target: 20% of the country's power demand from renewable sources by 2030, and 30% by 2040.
The Power Division's strategy paper for 2026–2030, published in July 2026, turns that into capacity: 10,000 MW of solar by 2030 — 5,500 MW on rooftops and 4,500 MW ground-mounted — plus 450–500 MW from other renewable sources. Rooftops carry more than half of the plan.
| Measure | Installed | As of |
|---|---|---|
| All solar, on- and off-grid | 1,571 MW (1,194 MW on-grid, 377 MW off-grid) | 30 September 2026 |
| All renewable energy | 1,864 MW | 30 September 2026 |
| Net-metered rooftop solar | 379 MWp across 5,026 systems | 1 October 2026 |
Figures come from SREDA's National Database of Renewable Energy (opens in a new tab) and its net-metering statistics (opens in a new tab), and cover projects reported to SREDA. About three-quarters of net-metered capacity — 290 MWp — is on the BREB network of Palli Bidyut Samitis.
Renewable Energy Policy 2025
The Power Division notified the policy on 2 June 2025, and it was published in the Bangladesh Gazette on 23 June 2025. It replaces the Renewable Energy Policy 2008. The parts that matter for rooftops:
- Rooftop solar under net metering, including peer-to-peer trading of solar power and letting developers lease a roof or sell power to the building's owner.
- Public housing. Rooftop solar is to be promoted on government residential buildings.
- Corporate tax holiday. Renewable energy projects commissioned between 1 July 2025 and 30 June 2030 pay no corporate income tax for 10 years, then half for 3 years and a quarter for 2 years.
- Equipment. Renewable energy parts and raw materials may be exempted from import duty and VAT. The policy allows this; the actual rates are set by the NBR — see tax and duty.
- Land. Government khas land, char land and fallow land can be used for renewable energy projects.
- Licensing. Plants of 5 MW or more that sell electricity need a licence from BERC.
Net metering
Net metering has run since the first guideline in July 2018. An amendment in November 2019 added the OPEX model, letting third-party investors own rooftop systems, and circulars in 2023 extended it to prepaid and smart meters. The Net Metering Guideline 2025 now sets the rules:
- Single- and three-phase consumers of every tariff category can apply.
- Inverter output up to 100% of your sanctioned load.
- Exports offset imports each month; 10% of net exports is kept as a maintenance charge.
- Leftover credit is paid out every three months.
- Apply online, with time limits on each step for your utility.
Our net-metering guide explains each rule, with worked bills and the application step by step.
Solar for new connections
A Power Division circular dated 23 December 2025 replaces earlier circulars from October 2023 and November 2025. It applies to buildings with at least 1,000 square feet of roof that will be usable for at least 20 years. When such a building gets a new electricity connection, it must install net-metered rooftop solar:
| Consumer | Connection | Requirement |
|---|---|---|
| Residential | Single-phase | Install rooftop solar as the Bangladesh National Building Code 2006 (amended 2020) requires |
| Residential | Three-phase, load of 10 kW or more | At least 3 kW |
| Industrial and commercial | Load of 10 kW or more | At least 20% of the approved load, where the roof has space |
| Industrial and commercial | Load below 10 kW | Optional, within the net-metering guideline's limits |
| Schools, hospitals and charities | Single-phase | Install rooftop solar as the building code and the National Rooftop Solar Programme require |
| Schools, hospitals and charities | Three-phase, load of 10 kW or more | At least 5 kW |
- Load increases. Existing consumers who apply for more load must install solar at the same rates, based on the extra load approved.
- These are minimums. You may install up to 100% of your approved load under the net-metering guideline.
- The circular took effect immediately.
The Tk 10.50 export incentive
A Power Division notification of 1 September 2026 sets a special rate for rooftop solar:
- Consumers who install rooftop solar under the Net Metering Guideline 2025 by 28 February 2027 and export their surplus to the grid get Tk 10.50 for each unit exported.
- The rate lasts three years, until 28 February 2030.
- Payment goes into the consumer's bank account every three months, in line with the guideline's settlement periods. It is never paid in cash.
- Panels, batteries, inverters and meters must meet BSTI and SREDA technical standards.
- Systems installed after 28 February 2027 do not qualify.
The rate is built up from an assumed generation cost of Tk 8 per unit, plus 20% profit and an 11.25% premium. Help is available from the Power Division's one-stop service centre and from your utility's district and upazila offices.
Solar on government buildings
The National Rooftop Solar Programme, approved on 29 June 2025, plans 2,000–3,000 MW of rooftop solar on government offices, educational institutions, hospitals and other public buildings. Government offices pay for their systems upfront (CAPEX). Schools and hospitals get theirs through third-party OPEX investors, at no upfront cost to them.
We have not found an official figure for how much the programme has installed so far, and we will add one when it is published.
Tax and duty
Beyond the corporate tax holiday in the Renewable Energy Policy 2025, taxes on solar equipment have been cut several times recently:
- The FY2025–26 budget cut the import duty on inverters.
- The FY2026–27 budget removed customs, regulatory and supplementary duties on solar equipment, while VAT and advance income tax remained.
- In September 2026 the NBR lowered the total tax on solar equipment imports further, for a limited period.
The rates and conditions differ between panels, inverters, batteries and mounting structures, and between importers. Rather than relying on a headline rate, ask your installer to show the duty and VAT they paid in the quote.
Financing
IDCOL lends for rooftop solar at 5–5.5%, Bangladesh Bank's refinance schemes cap the rate on qualifying green loans at 5%, and a Tk 1,500 crore government solar fund was set up in September 2026. Our IDCOL and solar financing guide compares the options.
Who does what
- Power Division
- Part of the Ministry of Power, Energy and Mineral Resources. Sets policy and issues the net-metering guideline, circulars and incentive tariffs, and runs the online net-metering portal.
- SREDA
- The Sustainable and Renewable Energy Development Authority. Promotes renewable energy, approves solar equipment models, runs the National Solar Help Desk, publishes capacity data and reviews net-metering complaints.
- BERC
- The Bangladesh Energy Regulatory Commission. Sets electricity tariffs, including the bulk rate used to pay out net-metering credit, and licenses power plants of 5 MW or more that sell electricity.
- Distribution utilities
- BPDB, BREB and its Palli Bidyut Samitis, DPDC, DESCO, WZPDCL and NESCO. They take net-metering applications, inspect systems, install meters, and bill and pay you.
- IDCOL
- A government-owned financial institution that lends for renewable energy, including rooftop solar for factories and commercial buildings.
- Bangladesh Bank
- The central bank. Refinances banks that lend for green projects, capping the rate the borrower pays.
- NBR
- The National Board of Revenue. Sets import duties and VAT on solar panels, inverters and batteries.
Timeline
- December 2008Renewable Energy Policy 2008The first national renewable energy policy: 5% of demand by 2015 and 10% by 2020.
- December 2012SREDA ActCreates SREDA, the government authority for renewable energy and energy efficiency.
- July 2018First net-metering guidelineRooftop owners can export surplus solar power to the grid.
- November 2019OPEX model addedAn amendment lets third-party investors own and run rooftop systems under net metering.
- June and October 2023Prepaid meters and new connectionsCirculars extend net metering to prepaid and smart meters and link rooftop solar to new connections.
- June 2025Renewable Energy Policy 2025Targets 20% of power demand from renewables by 2030 and 30% by 2040, replacing the 2008 policy.
- June 2025National Rooftop Solar ProgrammePlans 2,000–3,000 MW of rooftop solar on government offices, schools and hospitals.
- August 2025Net Metering Guideline 2025CurrentSystems up to 100% of sanctioned load, with leftover credit paid out every quarter.
- December 2025Solar for new connectionsBuildings with 1,000 sq ft or more of roof must install rooftop solar to get a new connection.
- July 2026Strategy paper 2026–2030Sets 10 GW of solar by 2030 — 5.5 GW rooftop and 4.5 GW ground-mounted.
- September 2026Tk 10.50 export incentiveSystems installed by February 2027 earn Tk 10.50 for each unit exported, until February 2030.
Common questions
What is Bangladesh's renewable energy target?
The Renewable Energy Policy 2025 targets 20% of the country's power demand from renewable sources by 2030 and 30% by 2040. The Power Division's strategy paper for 2026–2030 plans 10 GW of solar by 2030 to get there, 5.5 GW of it on rooftops.
Is rooftop solar mandatory in Bangladesh?
For some new connections, yes. Under a Power Division circular of 23 December 2025, a building with at least 1,000 square feet of roof usable for 20 years must install net-metered rooftop solar when it gets a new connection or a load increase. The minimum size depends on the consumer category and load.
How much does the government pay for rooftop solar electricity?
A Power Division notification of 1 September 2026 pays Tk 10.50 for each unit exported to the grid from rooftop systems installed under the Net Metering Guideline 2025 by 28 February 2027. The rate applies until 28 February 2030 and is paid into the consumer's bank account every three months.
Are there tax incentives for solar in Bangladesh?
Yes. The Renewable Energy Policy 2025 gives renewable energy projects commissioned between July 2025 and June 2030 a corporate income tax exemption — full for 10 years, then partial for 5 more. Import duties on solar equipment were also cut in 2026, though the rates and conditions have changed several times.
Which government body is responsible for solar energy in Bangladesh?
The Power Division sets policy. SREDA promotes renewable energy and approves equipment, BERC sets tariffs, and your distribution utility handles net-metering applications and payments.
Sources
- Renewable Energy Policy 2025 (Bangla), Power Division (opens in a new tab)
- National Renewable Energy Development Strategy Paper 2026–2030, Power Division (July 2026) (opens in a new tab)
- Circular on rooftop solar for new connections, Power Division (23 December 2025) (opens in a new tab)
- Notification on the rooftop solar incentive tariff, Power Division (1 September 2026) (opens in a new tab)
- National Rooftop Solar Programme implementation guideline, Power Division (opens in a new tab)
- Net Metering Guideline 2025 (Bangla), Power Division (opens in a new tab)
- SREDA: Letter on the 2019 OPEX amendment to the net-metering guideline (opens in a new tab)
- Renewable Energy Policy 2008, Power Division (opens in a new tab)
- Sustainable and Renewable Energy Development Authority Act 2012 (English text, Bangladesh Gazette) (opens in a new tab)
- SREDA: National Database of Renewable Energy (opens in a new tab)
- SREDA: Statistics of installed net-metering systems (opens in a new tab)
Most government documents are published in Bangla. See how we check our information on our sources page.