# SolarGreenBD — rooftop solar in Bangladesh: full reference > Bangladesh's hub for rooftop solar: compare verified solar installers, understand the 2025 net-metering guideline, estimate your payback, and see real rooftop success stories. Source: https://solargreenbd.com. Last updated: 2026-10-04. This file is generated from the same data as the website; each section links the page it comes from. When citing, please link that page and give its updated date. Every figure is taken from a primary source — Power Division and SREDA documents, SREDA's National Database of Renewable Energy, IDCOL, or a linked news report — and dated. Where this text and an official document differ, the official document applies. Our method: https://solargreenbd.com/about/sources ## Key facts Key facts on Bangladesh solar targets and capacity: - **20% by 2030** of power demand from renewables, rising to 30% by 2040 — Renewable Energy Policy 2025 - **10 GW** of solar by 2030, 5.5 GW of it on rooftops — Power Division strategy paper 2026–2030 - **1,571 MW** of solar installed nationwide, on- and off-grid, as of 30 September 2026 - **379 MWp** of net-metered rooftop solar across 5,026 systems, as of 1 October 2026 Sources: [Renewable Energy Policy 2025 (Bangla), Power Division](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2024/12/9e57f2d094ca438ca06fc1aa3119ff7a.pdf); [National Renewable Energy Development Strategy Paper 2026–2030, Power Division (July 2026)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2026/6/5ecd89f4-8ee0-4aae-b7ae-a5258d3c0d8c.pdf); [SREDA National Database of Renewable Energy](https://ndre.sreda.gov.bd/); [SREDA: Statistics of installed net-metering systems](https://solar.sreda.gov.bd/nem/nemstatistics.php) Key facts on net metering under the Net Metering Guideline 2025: - **100%** of your sanctioned load — the most your inverter can output - **90%** of net exported units become credit; 10% is a maintenance charge - **Every 3 months** leftover credit is paid out, at the end of Mar, Jun, Sep and Dec - **8 months** to finish installing once your utility approves the application Source: [Net Metering Guideline 2025 (Bangla), Power Division](https://nem.powerdivision.gov.bd/Content/manuals/NEM-Guideline-2025-Bangla.pdf) ## Net Metering in Bangladesh: The 2025 Guideline Explained Page: https://solargreenbd.com/net-metering-guide · Updated: 2026-10-01 How net metering works in Bangladesh under the Net Metering Guideline 2025: who is eligible, how big a rooftop solar system you can connect, how exported units are credited and paid, and how to apply online step by step. ### What changed in 2025 The Net Metering Guideline 2025 replaces the 2018 guideline, its 2019 amendment and the circulars issued since. - **Bigger systems.** Up to 100% of your sanctioned load, up from 70%. - **Every consumer in one rulebook.** Single- and three-phase consumers, and prepaid and smart meters, are covered by the guideline itself. - **Online applications.** Apply and track every stage on the Power Division's portal. - **Quarterly payouts.** Leftover credit is paid every three months, into a bank or mobile banking account or by cheque. ### Consumer categories that can apply - **Low voltage (LT), 230/400 V:** Residential (LT-A), irrigation pumps (LT-B), industry (LT-C1), education, religious and charitable institutions and hospitals (LT-D1), street lights and water pumps (LT-D2), battery charging stations (LT-D3), commercial and office (LT-E) - **Medium voltage (MT), 11 kV:** Residential (MT-1), commercial and office (MT-2), industry (MT-3), general (MT-5), battery charging stations (MT-7), irrigation pumps (MT-8) - **High voltage (HT), 33 kV:** General (HT-1), commercial and office (HT-2), industry (HT-3) - **Extra-high voltage (EHT), 132/230 kV:** All consumer categories ### How to apply, step by step 1. **Apply online** (You or your installer). Submit the application on the Power Division's portal, or on paper at your utility office. You get an SMS and email confirmation and can track each stage online. 2. **Site inspection** (Your utility). The utility checks your premises, the connection point and whether its own network needs changes — any such cost is yours. 3. **Approval** (Your utility; within 10 working days of applying). The utility issues permission to install. For online applications, the approval email is the permission letter. 4. **Install the system** (You and your installer; within 8 months of approval). Install using SREDA-approved equipment, complete the system checklist, upload it and ask the utility to evaluate the system. 5. **Evaluation** (Your utility). The utility inspects the installed system against the approved design and the technical standards. 6. **Agreement and connection** (You and your utility; within 15 working days of your evaluation request). You sign the net-metering agreement. The signing date is your commercial operation date, when credits start. ### Questions and answers #### Who can apply for net metering in Bangladesh? Any single-phase or three-phase consumer of a distribution utility who has no unpaid electricity bills, generates only from renewable sources such as solar, and owns the premises or has the owner's permission. Residential, commercial, industrial, institutional and irrigation consumers are all covered. #### How big a solar system can I connect under net metering? The inverter's AC output can be up to 100% of your sanctioned load. Medium-, high- and extra-high-voltage consumers are also limited to 80% of their transformer's rated capacity. Larger systems need a separate application, decided by the Power Division. #### Will my utility pay me for the electricity I export? Yes. Exported units first offset the units you import. Any credit left at the end of each three-month settlement period — March, June, September and December — is paid into your bank or mobile banking account, or by cheque. #### What rate are exported units paid at? Credit carried within a settlement period offsets imports at your normal tariff. Credit left at the end of the period is paid at the bulk rate set by BERC for your utility, which is usually lower than the retail rate on your bill. In both cases, 10% of each month's net exports is kept as a distribution maintenance charge. Separately, a September 2026 incentive pays Tk 10.50 per exported unit, until February 2030, for systems installed by 28 February 2027. See: [The Tk 10.50 export incentive](https://solargreenbd.com/government-policies#export-tariff) #### How long does the net-metering application take? The utility must approve or reject the application within 10 working days. You then have up to 8 months to install, and the utility must sign the agreement within 15 working days of your request for evaluation. #### Who pays for the net meter? You do. The utility normally buys, tests, installs and reads the bi-directional meter, but its cost — and the cost of any changes to the utility's network — is borne by the applicant. You may buy the meter yourself if the model is approved by your utility or SREDA. #### Can I use net metering with a prepaid meter? Yes. Under the 2025 guideline, prepaid and smart meters can be made bi-directional. Your credit units are used first, and nothing is deducted from your recharge balance while you still have credit. #### Can I connect a rooftop system I already have? Yes. Systems installed before the guideline can apply to convert to net metering, and the panel standards may be relaxed for older systems if you can prove when they were installed. #### Can I get net metering without paying for the system upfront? Yes, through the OPEX model: an investor company installs and runs the system at its own cost, and you buy the electricity it produces at an agreed rate, usually below your utility's tariff. You sign the OPEX contract before applying to the utility. #### Does a net-metered system work during load-shedding? Not on its own. A grid-tied inverter switches off when the grid goes down, so it cannot feed lines that workers expect to be dead. For backup, ask an installer about a hybrid system with batteries. See: [What happens during load-shedding](https://solargreenbd.com/solar-basics/how-rooftop-solar-works#load-shedding) ### Sources - [Net Metering Guideline 2025 (Bangla), Power Division](https://nem.powerdivision.gov.bd/Content/manuals/NEM-Guideline-2025-Bangla.pdf) - [Net Energy Metering online portal, Power Division](https://nem.powerdivision.gov.bd/) - [National Solar Help Desk, SREDA](https://shd.sreda.gov.bd/) - [Circular on rooftop solar for new connections, Power Division (23 December 2025)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2025/11/892ddbb7-bef5-4d7d-a613-b6291f872bfe.pdf) - [Notification on the rooftop solar incentive tariff, Power Division (1 September 2026)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2026/8/7e9cb382-d955-4b4c-af12-ea1fd50805b6.pdf) ## Solar Energy Policy in Bangladesh: The Rules for Rooftop Solar Page: https://solargreenbd.com/government-policies · Updated: 2026-10-01 Bangladesh's solar and renewable energy policies in one place: national targets, the Renewable Energy Policy 2025, net metering, the rooftop solar rule for new connections, the 2026 export incentive tariff, tax breaks and who does what. ### Rooftop solar for new connections Under a Power Division circular of 23 December 2025, buildings with 1,000 sq ft or more of roof must install net-metered rooftop solar to get a new connection or a load increase: - **Residential, single-phase:** Install rooftop solar as the Bangladesh National Building Code 2006 (amended 2020) requires - **Residential, three-phase, load of 10 kw or more:** At least 3 kW - **Industrial and commercial, load of 10 kw or more:** At least 20% of the approved load, where the roof has space - **Industrial and commercial, load below 10 kw:** Optional, within the net-metering guideline's limits - **Schools, hospitals and charities, single-phase:** Install rooftop solar as the building code and the National Rooftop Solar Programme require - **Schools, hospitals and charities, three-phase, load of 10 kw or more:** At least 5 kW ### Policy timeline - **December 2008 — Renewable Energy Policy 2008.** The first national renewable energy policy: 5% of demand by 2015 and 10% by 2020. - **December 2012 — SREDA Act.** Creates SREDA, the government authority for renewable energy and energy efficiency. - **July 2018 — First net-metering guideline.** Rooftop owners can export surplus solar power to the grid. - **November 2019 — OPEX model added.** An amendment lets third-party investors own and run rooftop systems under net metering. - **June and October 2023 — Prepaid meters and new connections.** Circulars extend net metering to prepaid and smart meters and link rooftop solar to new connections. - **June 2025 — Renewable Energy Policy 2025.** Targets 20% of power demand from renewables by 2030 and 30% by 2040, replacing the 2008 policy. - **June 2025 — National Rooftop Solar Programme.** Plans 2,000–3,000 MW of rooftop solar on government offices, schools and hospitals. - **August 2025 — Net Metering Guideline 2025.** Systems up to 100% of sanctioned load, with leftover credit paid out every quarter. - **December 2025 — Solar for new connections.** Buildings with 1,000 sq ft or more of roof must install rooftop solar to get a new connection. - **July 2026 — Strategy paper 2026–2030.** Sets 10 GW of solar by 2030 — 5.5 GW rooftop and 4.5 GW ground-mounted. - **September 2026 — Tk 10.50 export incentive.** Systems installed by February 2027 earn Tk 10.50 for each unit exported, until February 2030. ### Who does what - **Power Division.** Part of the Ministry of Power, Energy and Mineral Resources. Sets policy and issues the net-metering guideline, circulars and incentive tariffs, and runs the online net-metering portal. - **SREDA.** The Sustainable and Renewable Energy Development Authority. Promotes renewable energy, approves solar equipment models, runs the National Solar Help Desk, publishes capacity data and reviews net-metering complaints. - **BERC.** The Bangladesh Energy Regulatory Commission. Sets electricity tariffs, including the bulk rate used to pay out net-metering credit, and licenses power plants of 5 MW or more that sell electricity. - **Distribution utilities.** BPDB, BREB and its Palli Bidyut Samitis, DPDC, DESCO, WZPDCL and NESCO. They take net-metering applications, inspect systems, install meters, and bill and pay you. - **IDCOL.** A government-owned financial institution that lends for renewable energy, including rooftop solar for factories and commercial buildings. - **Bangladesh Bank.** The central bank. Refinances banks that lend for green projects, capping the rate the borrower pays. - **NBR.** The National Board of Revenue. Sets import duties and VAT on solar panels, inverters and batteries. ### Questions and answers #### What is Bangladesh's renewable energy target? The Renewable Energy Policy 2025 targets 20% of the country's power demand from renewable sources by 2030 and 30% by 2040. The Power Division's strategy paper for 2026–2030 plans 10 GW of solar by 2030 to get there, 5.5 GW of it on rooftops. #### Is rooftop solar mandatory in Bangladesh? For some new connections, yes. Under a Power Division circular of 23 December 2025, a building with at least 1,000 square feet of roof usable for 20 years must install net-metered rooftop solar when it gets a new connection or a load increase. The minimum size depends on the consumer category and load. #### How much does the government pay for rooftop solar electricity? A Power Division notification of 1 September 2026 pays Tk 10.50 for each unit exported to the grid from rooftop systems installed under the Net Metering Guideline 2025 by 28 February 2027. The rate applies until 28 February 2030 and is paid into the consumer's bank account every three months. #### Are there tax incentives for solar in Bangladesh? Yes. The Renewable Energy Policy 2025 gives renewable energy projects commissioned between July 2025 and June 2030 a corporate income tax exemption — full for 10 years, then partial for 5 more. Import duties on solar equipment were also cut in 2026, though the rates and conditions have changed several times. #### Which government body is responsible for solar energy in Bangladesh? The Power Division sets policy. SREDA promotes renewable energy and approves equipment, BERC sets tariffs, and your distribution utility handles net-metering applications and payments. ### Sources - [Renewable Energy Policy 2025 (Bangla), Power Division](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2024/12/9e57f2d094ca438ca06fc1aa3119ff7a.pdf) - [National Renewable Energy Development Strategy Paper 2026–2030, Power Division (July 2026)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2026/6/5ecd89f4-8ee0-4aae-b7ae-a5258d3c0d8c.pdf) - [Circular on rooftop solar for new connections, Power Division (23 December 2025)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2025/11/892ddbb7-bef5-4d7d-a613-b6291f872bfe.pdf) - [Notification on the rooftop solar incentive tariff, Power Division (1 September 2026)](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2026/8/7e9cb382-d955-4b4c-af12-ea1fd50805b6.pdf) - [National Rooftop Solar Programme implementation guideline, Power Division](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2024/12/24a604ebe45d4baab96fa5c0262ac0b1.pdf) - [Net Metering Guideline 2025 (Bangla), Power Division](https://nem.powerdivision.gov.bd/Content/manuals/NEM-Guideline-2025-Bangla.pdf) - [SREDA: Letter on the 2019 OPEX amendment to the net-metering guideline](https://www.nshd.sreda.gov.bd/uploads/p/1719294852.pdf) - [Renewable Energy Policy 2008, Power Division](https://objectstorage.ap-dcc-gazipur-1.oraclecloud15.com/n/axvjbnqprylg/b/V2Ministry/o/office-powerdivision/2024/12/4b8540653ea64ae5a157c6e37f8db8ed.pdf) - [Sustainable and Renewable Energy Development Authority Act 2012 (English text, Bangladesh Gazette)](https://www.dpp.gov.bd/upload_file/gazettes/10720_39500.pdf) - [SREDA: National Database of Renewable Energy](https://ndre.sreda.gov.bd/) - [SREDA: Statistics of installed net-metering systems](https://solar.sreda.gov.bd/nem/nemstatistics.php) ## IDCOL and Rooftop Solar Financing in Bangladesh Page: https://solargreenbd.com/government-policies/idcol-financing · Updated: 2026-10-01 How to finance rooftop solar in Bangladesh: IDCOL's rooftop solar loan, Bangladesh Bank's green refinance schemes, the 2026 government solar fund, bank loans and the no-upfront-cost OPEX model. ### IDCOL rooftop solar loan terms - **Loan size:** Up to 80% of the project cost — you put in at least 20% - **Tenor:** 10 years, including a 1-year grace period on principal - **Repayment:** Monthly - **Interest rate:** 5.5% fixed with a bank guarantee for 50% of the loan, or 5.0% with a guarantee for 75% - **Who borrows:** The roof owner (CAPEX) or a third-party RESCO that owns the system and sells you the power (OPEX) - **Equipment:** An IDCOL-enlisted installer and panels that meet IDCOL's technical standard ### Ways to finance rooftop solar - **IDCOL rooftop loan** — best for: Factories and commercial buildings. Rate: 5–5.5%. How to apply: Directly to IDCOL. - **Bangladesh Bank refinance scheme** — best for: Businesses and other bank customers. Rate: Up to 5%. How to apply: Through a participating bank or NBFI. - **Ordinary bank green loan** — best for: Anyone a bank will lend to. Rate: Market rate, often 9–12%. How to apply: Your bank. - **OPEX (solar as a service)** — best for: Owners without the capital, or who don't want to run the system. Rate: No loan — you buy the power. How to apply: An OPEX investor company. ### Questions and answers #### What interest rate does IDCOL charge for rooftop solar? IDCOL's rooftop solar loan is at a fixed 5.5% with a bank guarantee covering 50% of the loan, or 5.0% with a guarantee covering 75%. It covers up to 80% of the project cost over 10 years, including a 1-year grace period. #### Does IDCOL finance rooftop solar for homes? IDCOL's rooftop programme is aimed at commercial and industrial buildings, and it does not publish a residential rooftop loan. Homeowners can ask their bank about Bangladesh Bank's refinance scheme for environment-friendly products, which lists net-metered rooftop solar, or consider an OPEX arrangement. #### How do I apply to IDCOL for a rooftop solar loan? Fill in IDCOL's rooftop solar assessment sheet and email it to IDCOL, or use its online enquiry form. You will need company details, your sanctioned load and load profile, six months of electricity bills and details of your roof. Use an installer enlisted with IDCOL. #### Can I get solar without paying upfront? Yes. Under the OPEX model, a third-party company installs and runs the system at its own cost, and you buy the electricity it produces at an agreed rate, usually below your utility's tariff. IDCOL also lends to these companies. See: [CAPEX and OPEX under net metering](https://solargreenbd.com/net-metering-guide#capex-opex) #### Is there a Bangladesh Bank loan for solar panels? Bangladesh Bank does not lend to consumers directly. It refinances banks that lend for environment-friendly products, including net-metered rooftop solar, and caps the rate the borrower pays at 5%. Apply through a bank or financial institution that takes part in the scheme. ### Sources - [IDCOL: Rooftop solar project financing](https://idcol.org/idcol_new/public/renewable/rooftop-solar-project) - [IDCOL: Key milestones](https://idcol.org/idcol_new/public/key-milestone) - [IDCOL: Solar Home System programme](https://idcol.org/idcol_new/public/renewable/solar-home-system-program) - [IDCOL: Rooftop solar assessment sheet (Word)](https://idcol.org/idcol_new/public/assets/downloads/1697023704_Assessment-Sheet.docx) - [IDCOL: Rooftop solar enquiry form](https://idcol.org/idcol_new/public/rooftoop-solar-contact) - [World Bank: Scaling-up Renewable Energy Project completion report (January 2026)](https://documents1.worldbank.org/curated/en/099021126190033544/pdf/BOSIB-415e90ad-7ddd-4bce-a2b2-1d5b58ece616.pdf) - [Bangladesh Bank: Refinance scheme for environment-friendly products — participation agreement](https://www.bb.org.bd/aboutus/dept/gbcsrd/agreement_envrnmntproduct.pdf) - [The Financial Express: Green Transformation Fund window for rural industries (May 2026)](https://thefinancialexpress.com.bd/economy/bb-allocates-tk-10b-green-transformation-fund-for-rural-industries) - [TBS News: Government creating Tk 1,500 crore fund for solar loans (September 2026)](https://www.tbsnews.net/economy/energy/govt-creating-tk1500cr-fund-offer-loans-6-interest-solar-power-projects-1545046) - [TBS News: IDCOL's rooftop solar financing to date (August 2026)](https://www.tbsnews.net/economy/corporates/idcol-finances-585mwp-rooftop-solar-project-narayanganj-1512466) - [CPD: Industrial rooftop solar in the RMG sector (August 2026)](https://cpd.org.bd/resources/2026/08/Industrial-Rooftop-Solar-in-RMG-Sector.pdf) ## Rooftop Solar Basics for Bangladesh Page: https://solargreenbd.com/solar-basics · Updated: 2026-10-01 Learn how rooftop solar works in Bangladesh, how to size a system, what solar panels cost and how payback works under net metering — in plain language. ### Guides - [How Rooftop Solar Works in Bangladesh](https://solargreenbd.com/solar-basics/how-rooftop-solar-works): A plain-language guide to rooftop solar in Bangladesh: panels, inverters, net metering, what happens during load-shedding, and how monsoon weather affects output. - [How to Size a Rooftop Solar System in Bangladesh](https://solargreenbd.com/solar-basics/system-sizing): Work out the right rooftop solar system size for your home or factory in Bangladesh from your electricity bill, roof space and sanctioned load. - [Rooftop Solar Cost and Payback in Bangladesh](https://solargreenbd.com/solar-basics/cost-and-payback): What a rooftop solar system costs in Bangladesh, what drives the solar panel price, how to read an installer quote, and how to estimate your payback under net metering. - [Solar Glossary: Rooftop Solar Terms Explained](https://solargreenbd.com/solar-basics/glossary): Plain-language definitions of rooftop solar terms used in Bangladesh — kWp, sanctioned load, net metering, grid-tied inverters, SREDA, IDCOL and more. ### Rules of thumb - **~100 sq ft** of shade-free roof per kWp of panels - **3.5–4 units** generated per kWp per day, averaged over a year - **100%** of your sanctioned load — the net-metering size limit - **25 years** a common panel performance warranty ### Questions and answers #### Does rooftop solar work during load-shedding? A standard grid-tied system switches off when the grid goes down. This is a safety feature called anti-islanding, which protects line workers. If you need power during outages, ask an installer about a hybrid system with batteries. See: [Grid-tied, hybrid or off-grid?](https://solargreenbd.com/solar-basics/how-rooftop-solar-works#system-types) #### Do solar panels work during the monsoon? Yes, but output drops on cloudy days. Panels still produce power from diffuse light, and the yearly generation figures installers quote should already include the lower monsoon months. See: [Sun, monsoon and haze](https://solargreenbd.com/solar-basics/how-rooftop-solar-works#weather) #### How much roof space do I need? As a rule of thumb, allow about 100 square feet of shade-free roof for every kWp of panels. Water tanks, stair rooms and neighbouring buildings that cast shade reduce the usable area. See: [Measure your roof](https://solargreenbd.com/solar-basics/system-sizing#roof-space) #### How big a system am I allowed to install? Under the 2025 net-metering guideline, a system can be up to 100% of your sanctioned load. Both single-phase and three-phase connections are eligible. See: [Check your sanctioned load](https://solargreenbd.com/solar-basics/system-sizing#sanctioned-load) #### Can I sell electricity back to the grid? Yes. Under net metering, units you export are recorded by a bi-directional meter and credited against the units you import. Credit left at the end of each three-month settlement period is paid at your utility's bulk rate into your bank or mobile banking account. See: [Read the net-metering guide](https://solargreenbd.com/net-metering-guide) #### How long do solar panels last? Good-quality panels are commonly sold with a 25-year performance warranty and can keep working beyond it at slightly reduced output. Inverters have a shorter life and usually need replacing at least once during the life of the panels. #### Do solar panels need cleaning? Yes. Dust, bird droppings and soot lower output, especially in the dry season. Rinse panels with clean water and a soft brush — never abrasive cleaners — and do it early in the morning or late in the day when the glass is cool. #### Is financing available for rooftop solar? IDCOL, a government-owned financial institution, finances renewable energy projects in Bangladesh, including rooftop solar. Some banks also offer green financing. Terms and eligibility vary by programme. See: [IDCOL financing programmes](https://solargreenbd.com/government-policies/idcol-financing) ## Solar glossary Page: https://solargreenbd.com/solar-basics/glossary · Updated: 2026-10-01 - **AC (alternating current):** The kind of electricity in your sockets and on the national grid — 230 volts at 50 hertz in Bangladesh. An inverter converts the DC from solar panels into AC. - **Anti-islanding:** A safety feature in grid-tied inverters that shuts the system down when the grid goes off, so no power flows into lines that workers expect to be dead. It is why a standard grid-tied system gives no backup during load-shedding. - **BERC:** Bangladesh Energy Regulatory Commission — the regulator that sets electricity tariffs, including the slab rates on your bill. - **Bi-directional meter (net meter):** A meter that records both the units you import from the grid and the units your solar system exports to it. Net metering needs one. - **Bifacial panel:** A panel that collects light on both faces, gaining extra output from light reflected off the roof below. Most common on large industrial systems. - **Bulk rate:** The tariff BERC sets for the electricity a distribution utility buys in bulk. Under the 2025 net-metering guideline, credit left at the end of a settlement period is paid out at this rate, which is usually lower than the retail rate on your bill. - **Capacity utilisation factor (CUF):** A system's actual yearly generation as a share of what it would produce running at full rated power every hour of the year. Used to compare how well systems perform. - **CAPEX model:** Owning your solar system outright: you pay for it upfront or with a loan, and keep all the savings and net-metering payouts. - **DC (direct current):** The kind of electricity solar panels and batteries produce. It must be converted to AC before your home or the grid can use it. - **Degradation:** The slow loss of a panel's output as it ages, usually a fraction of a percent each year. A performance warranty sets the most a panel is allowed to lose. - **Distribution utility:** The company that supplies power to your premises and sends your bill — for example BPDB, DPDC, DESCO, BREB (through its Palli Bidyut Samitis), WZPDCL or NESCO. Net-metering applications go through your utility. - **Earthing (grounding):** Connecting a system's metal parts to the ground so faults and lightning surges have a safe path away from people and equipment. Essential on Bangladeshi rooftops, which see frequent storms. - **EPC:** Engineering, procurement and construction — a company that designs, supplies and installs a complete system. Most installers in our directory work as EPCs. - **Export:** Units your system sends to the grid when it produces more than your home or factory is using at that moment. - **Grid-tied system (on-grid):** A solar system connected to the grid without batteries. It is the simplest and cheapest kind, and the kind net metering is designed for, but it switches off during power cuts. - **Hybrid system:** A grid-connected system with batteries, so it can keep selected loads running during outages. It costs more than a grid-tied system, and the batteries need replacing during the system's life. - **IDCOL:** Infrastructure Development Company Limited — a government-owned financial institution that funds renewable energy in Bangladesh, from rural solar home systems to industrial rooftop solar. - **Import:** Units you take from the grid — at night, or when your load is larger than what your panels are producing. - **Inverter:** The box that converts DC from your panels into AC for your home and the grid. It also monitors the system and handles safety shutdowns. - **IPS:** Instant power supply — the battery backup unit many Bangladeshi homes use during load-shedding. It is separate from a solar system unless your installer designs them to work together. - **kW (kilowatt):** A rate of power: 1,000 watts. Your sanctioned load and an appliance's rating are measured in kW. - **kWh (unit):** A quantity of energy — one kilowatt used for one hour. The "units" on your electricity bill are kWh. - **kWp (kilowatt peak):** A solar system's rated output under standard test conditions. Systems are sized and priced in kWp; a 5 kWp system might be ten to twelve panels. - **Load-shedding:** Planned power cuts when demand exceeds supply. A grid-tied solar system switches off during them; a hybrid system can keep running. - **Microinverter:** A small inverter fitted behind each panel instead of one central inverter, so shade on one panel does not drag down the rest. It costs more per kWp. - **Monocrystalline panel:** A panel made from single-crystal silicon cells. Dark in colour and more efficient than polycrystalline panels, it is now the most common choice for rooftops. - **Mounting structure:** The frame that holds panels at the right angle. On flat concrete (RCC) roofs it is usually a raised steel frame; on tin-shed factory roofs, panels are clamped to rails fixed to the roof sheets. - **Net metering:** An arrangement where the units you export are credited against the units you import, so you are billed for the difference. Under Bangladesh's 2025 guideline, 90% of net exports become credit, and credit left at the end of each settlement period is paid out. - **Off-grid system:** A solar system with batteries and no grid connection, such as the solar home systems used in rural areas. It cannot use net metering. - **OPEX model:** A third-party arrangement where an investor company installs, runs and maintains a solar system on your premises at its own cost, and you buy the electricity it produces at an agreed rate, usually below your utility's tariff. - **Payback period:** How many years of savings it takes to cover what you paid for the system. Upfront cost divided by yearly savings. - **Peak sun hours:** The number of hours a day that sunlight averages 1,000 watts per square metre — a simple way to express how much solar energy a place receives. - **Performance warranty:** A manufacturer's promise that a panel will still produce a set share of its rated output after a number of years, commonly 25. Separate from the product warranty, which covers defects. - **Polycrystalline panel:** A panel made from multi-crystal silicon cells, recognisable by its blue, speckled look. Cheaper but less efficient than monocrystalline. - **RE accounting meter (solar accounting meter):** A meter that records what your solar system generates, including its highest monthly output. The 2025 net-metering guideline requires one on every net-metered system, alongside the net meter. - **Sanctioned load:** The maximum load, in kW, your utility has approved for your connection. It is printed on your bill. Under the 2025 guideline a net-metered system can be up to 100% of it. - **Settlement period:** The three months over which net-metering credit builds up, ending with the March, June, September and December bills. At the end of each one, leftover credit is paid out at the bulk rate and the balance resets to zero. - **Shading:** Anything that blocks sunlight from the panels — a water tank, stair room, tree or taller building. Even partial shade can cut a panel's output sharply. - **Single-phase / three-phase:** Types of grid connection. Most homes are single-phase; larger buildings and factories are usually three-phase. Both are eligible for net metering under the 2025 guideline. - **Solar home system (SHS):** A small off-grid kit — panel, battery and lights — used widely in rural Bangladesh, many financed through IDCOL. - **Specific yield:** Yearly generation per kWp installed, in kWh per kWp. It lets you compare sites and quotes; our payback calculator starts from 1,350 kWh per kWp. - **SREDA:** Sustainable and Renewable Energy Development Authority — the government agency that promotes renewable energy in Bangladesh and runs the National Solar Help Desk. - **String inverter:** One central inverter fed by "strings" of panels wired together. The most common and cost-effective choice for unshaded roofs. - **Tilt angle:** The angle of the panels from horizontal. In Bangladesh, south-facing panels tilted at roughly 20–25° — close to the country's latitude — capture the most energy over a year. ## Rooftop Solar Installers in Bangladesh Page: https://solargreenbd.com/installers · Updated: 2026-10-01 Compare rooftop solar installers in Bangladesh by their net-metered track record in SREDA's national database — with each company's head office, the customers it serves, whether it offers OPEX, and notable projects. Companies are listed if SREDA has recorded net-metered rooftop systems for them, in SREDA's order by installed capacity; nobody pays to be listed. Method: https://solargreenbd.com/installers/verification. SREDA figures as of 30 Sept 2026, from [SREDA: Statistics of EPC companies (net-metered rooftop solar)](https://ndre.sreda.gov.bd/index.php?id=26&i=3). 1. **Scube Technologies** — 34.327 MWp across 26 net-metered projects in SREDA's records. A Dhaka EPC contractor focused on industrial rooftop and utility-scale solar. Head office: Dhanmondi, Dhaka. Serves: Commercial & industrial. Offers: Design & installation, Operation & maintenance. Website: https://www.scube.com.bd/ - Meghna Group, 11.7 MWp, Sonargaon, Narayanganj ([pv magazine, 2021](https://www.pv-magazine.com/2021/12/31/bangladeshs-rooftop-solar-sector-gains-momentum/)) - BRB Cable, 8.44 MWp, BSCIC Kushtia ([pv magazine, 2021](https://www.pv-magazine.com/2021/12/31/bangladeshs-rooftop-solar-sector-gains-momentum/)) 2. **Omera Renewable Energy** — 31.748 MWp across 20 net-metered projects in SREDA's records. East Coast Group's rooftop solar company. Clients can buy a system outright, pay in instalments, or buy the power under a 20-year agreement. Part of East Coast Group. Serves: Commercial & industrial, Institutional. Offers: Design & installation, OPEX / no upfront cost. - JTI Bangladesh, 2.1 MW, Tongi (agreement signed 2023) ([Daily Observer](https://www.observerbd.com/news/452477)) - Bangladesh Bridge Authority, 6.03 MWp, Padma Bridge (agreement signed 2025) ([TBS News](https://www.tbsnews.net/economy/corporates/bangladesh-bridge-authority-signs-deal-omera-renewable-energy-1236216)) 3. **Super Star Renewable Energy** — 18.859 MWp across 29 net-metered projects in SREDA's records. Super Star Group's solar company, founded in 2013, selling solar products and building rooftop systems. Head office: Tejgaon, Dhaka. Part of Super Star Group. Serves: Residential, Commercial & industrial, Institutional. Offers: Design & installation, Operation & maintenance. Website: https://superstarsolarbd.com/ - Jashore University of Science and Technology ([SREDA system #9055](https://ndre.sreda.gov.bd/index.php?id=06&kid=9055)) 4. **NetZero Energy & Technology** — 18.303 MWp across 6 net-metered projects in SREDA's records. A Dhaka EPC firm building megawatt-scale factory rooftop systems and telecom solar. Head office: Middle Badda, Dhaka. Serves: Commercial & industrial. Offers: Design & installation. Website: https://netzeroet.com/ - Hoorain HTF, 13.5 MW (2025) ([Company website](https://netzeroet.com/)) - Akij Bashir Cables, 1.3 MWp (2025) ([Company website](https://netzeroet.com/)) 5. **Cynergy** — 10.194 MWp across 2 net-metered projects in SREDA's records. A Dhaka solar EPC firm founded in 2021, mainly serving industrial rooftops. Head office: Gulshan, Dhaka. Serves: Residential, Commercial & industrial. Offers: Design & installation, Operation & maintenance. Website: https://cynergybd.net/ - Janata Jute Mills, 2.4 MWp, Boalmari, Faridpur (2023, IDCOL-financed) ([Green Watch](https://greenwatchbd.com/renewable/7488)) - Akij Biax Films, 6.03 MWp, Trishal (2025) ([Company website](https://cynergybd.net/projects/)) 6. **Solaric** — 7.787 MWp across 7 net-metered projects in SREDA's records. A solar company founded in 2009 that builds industrial rooftop systems for clients to own or under OPEX. Head office: Bashundhara, Dhaka. Serves: Commercial & industrial. Offers: Design & installation, OPEX / no upfront cost, Operation & maintenance. Website: https://www.solaricglobal.com/ - Asian Paints Bangladesh, 850 kWp, Mirsarai (2026) ([Textile Focus](https://textilefocus.com/solaric-and-asian-paints-bangladesh-inaugurate-850-kwp-rooftop-solar-power-plant-at-mirsarai-plant/)) - Palmal (ACML), 6.6 MWp, OPEX ([Company website](https://www.solaricglobal.com/projects/completed)) 7. **Property Development Ltd (PDL)** — 6.694 MWp across 2 net-metered projects in SREDA's records. PRAN-RFL Group's construction and engineering company. Its website does not list solar services. Head office: Middle Badda, Dhaka. Part of PRAN-RFL Group. Website: https://propertydevelopmentltd.com/ 8. **Rancon Infrastructures & Engineering** — 3.956 MWp across 10 net-metered projects in SREDA's records. RANCON Group's solar and steel engineering company, set up in 2017, offering CAPEX and OPEX rooftop systems. Head office: Tejgaon, Dhaka. Part of RANCON Group. Serves: Commercial & industrial. Offers: Design & installation, OPEX / no upfront cost, Operation & maintenance. Website: https://riel.com.bd/ - Rancon cold storage, 296 kWp, Chattogram (2026) ([TBS News](https://www.tbsnews.net/bangladesh/energy/rancon-launches-countrys-first-solar-powered-cold-storage-ctg-1434586)) - Rancon Electronics, 1 MWp, Kashimpur, Gazipur (2023, IDCOL-financed) ([The Daily Star](https://www.thedailystar.net/business/economy/news/rancon-avails-tk-579cr-idcol-loan-rooftop-solar-plant-3227821)) 9. **Rahimafrooz Renewable Energy** — 3.685 MWp across 13 net-metered projects in SREDA's records. A long-established solar company, historically focused on rural solar home systems, that also builds rooftop systems. Head office: Mohakhali, Dhaka. Part of Rahimafrooz Group. Serves: Institutional. Offers: Design & installation, Operation & maintenance. Website: https://rahimafrooz-solar.com/ - Narayanganj City Corporation public library and health centre ([ICLEI case study, 2022](https://urban-leds.org/wp-content/uploads/2022/02/Case-Study-4_Narayanganj-SPV.pdf)) 10. **SincoS Green Tech** — 3.658 MWp across 6 net-metered projects in SREDA's records. The solar EPC company of SincoS Group, a Dhaka automation and engineering group. Head office: Panthapath, Dhaka. Part of SincoS Group. Serves: Commercial & industrial. Offers: Design & installation, Operation & maintenance. Website: https://sincosgreentech.com/ - Quality Feed Mills, 4.1 MWp, Nandigram, Bogura ([Company website](https://sincosgreentech.com/)) - Akij Jute Mills, 1.75 MWp, Gopalganj ([Company website](https://sincosgreentech.com/)) 11. **Sincos Automation Technologies** — 3.2 MWp across 1 net-metered project in SREDA's records. A SincoS Group company; the group's solar work is marketed through its sister company, SincoS Green Tech. Head office: Kalabagan, Dhaka. Part of SincoS Group. Website: https://www.sincosbd.com/ 12. **Filament Engineering** — 2.014 MWp across 63 net-metered projects in SREDA's records. A Dhaka engineering company founded in 2008 that makes solar electronics and installs grid-tied systems, many on government buildings. Head office: Mohakhali DOHS, Dhaka. Part of Muspana. Serves: Residential, Commercial & industrial, Institutional. Offers: Design & installation, Operation & maintenance. Website: https://muspana.com/ - PWD Uttara apartments, 700 kWp, Dhaka ([Company website](https://muspana.com/projects/solar-projects/)) - World Bank office, 85 kWp, Agargaon ([Company website](https://muspana.com/projects/solar-projects/)) 13. **Joules Power (JPL)** — 1.898 MWp across 4 net-metered projects in SREDA's records. A Dhaka power producer that runs utility solar plants and builds factory rooftop systems, mainly under OPEX. Head office: Tejgaon, Dhaka. Part of Expo Group. Serves: Commercial & industrial. Offers: OPEX / no upfront cost. Website: https://jpl-bd.com/ - Comptex Bangladesh (Robintex), 3.2 MWp, Rupganj (2022, OPEX) ([pv magazine](https://www.pv-magazine.com/2022/04/12/bangladeshs-highest-opex-rooftop-pv-plant-goes-online/)) 14. **Samuda Green Energy** — 1.676 MWp across 2 net-metered projects in SREDA's records. 15. **Grameen Shakti** — 1.534 MWp across 6 net-metered projects in SREDA's records. A not-for-profit renewable energy company founded in 1996, known for rural solar home systems, that now also installs grid-tied rooftop systems. Head office: Telecom Bhaban, Dhaka. Serves: Commercial & industrial, Institutional. Offers: Design & installation, OPEX / no upfront cost, Operation & maintenance. Website: https://www.gshakti.org/ - Shanta Denims, 300 kWp ([Company website](https://www.gshakti.org/what-we-do/keyprograms/solar-roof-top-system)) - Grameen New Motors, 350 kWp ([Company website](https://www.gshakti.org/what-we-do/keyprograms/solar-roof-top-system)) 16. **UCC Power** — 1.431 MWp across 2 net-metered projects in SREDA's records. The renewable energy division of Dhaka IT distributor UCC, which imports solar equipment and installs grid-tied systems. Head office: Shewrapara, Mirpur, Dhaka. Part of UCC (United Computer Center). Serves: Residential, Commercial & industrial, Institutional. Offers: Design & installation, Operation & maintenance. Website: https://www.uccpower.com/ - Square Denim, 4 MWp, Habiganj ([Company website](https://power.ucc.com.bd/)) 17. **Versute Engineering** — 1.4 MWp across 2 net-metered projects in SREDA's records. A Dhaka power-sector engineering and construction firm. Its website does not mention solar. Head office: Uttara, Dhaka. Website: http://www.versutebd.com/ 18. **Novelty Energy** — 1.283 MWp across 1 net-metered project in SREDA's records. The renewable energy arm of the Novelty engineering group, designing and installing rooftop and ground-mounted solar. Head office: Uttara, Dhaka. Part of Novelty. Serves: Commercial & industrial, Institutional. Offers: Design & installation. Website: https://noveltyeng.com/energy - Green Board Fiber Mills, 1.3 MW ([Company website](https://noveltyeng.com/re_projects)) 19. **PVSUN Energy** — 900 kWp across 2 net-metered projects in SREDA's records. A Dhaka installer whose listed projects are rooftop systems at cold stores in Rajshahi. Head office: Eskaton, Dhaka. Serves: Residential, Commercial & industrial. Offers: Design & installation. Website: https://www.pvsunenergy.com/ - Raz Cold Storage, 842 kWp, Paba, Rajshahi ([Company website](https://www.pvsunenergy.com/projects)) - Sarkar Cold Storage, 540 kWp, Baya, Rajshahi ([Company website](https://www.pvsunenergy.com/projects)) 20. **Fourth Partner Energy Bangladesh** — 858.2 kWp across 3 net-metered projects in SREDA's records. The Bangladesh subsidiary of an Indian solar developer that owns and runs rooftop systems on factories and sells them the power. Head office: Gulshan, Dhaka. Part of Fourth Partner Energy (India). Serves: Commercial & industrial. Offers: OPEX / no upfront cost. Website: https://www.fourthpartner.co/bangladesh.html - Union Label, 760 kWp ([Company website](https://www.fourthpartner.co/bangladesh.html)) - Evince Textiles, 716 kWp ([Company website](https://www.fourthpartner.co/bangladesh.html)) 21. **Chint Solar (Bangladesh)** — 845.83 kWp across 2 net-metered projects in SREDA's records. The Bangladesh subsidiary of China's CHINT Group, set up in 2021, which builds solar plants and commercial rooftop systems. Part of CHINT Group (China). Serves: Commercial & industrial. Offers: Design & installation, Operation & maintenance. Website: https://energy.chint.com/ 22. **MALA Enterprise** — 760 kWp across 2 net-metered projects in SREDA's records. An installer with two net-metered industrial rooftop systems in SREDA's records. - Magic Sweater, 660 kWp, Nandail, Mymensingh (2025) ([SREDA system #7209](https://ndre.sreda.gov.bd/index.php?id=06&kid=7209)) - Sarker Steel Mills, 100 kWp, Dhamrai, Dhaka (2024) ([SREDA system #7673](https://ndre.sreda.gov.bd/index.php?id=06&kid=7673)) 23. **Dana Power Company** — 733 kWp across 1 net-metered project in SREDA's records. The power-generation arm of Dana Group, an engineering-equipment group, which installs industrial rooftop solar. Head office: Banani, Dhaka. Part of Dana Group. Serves: Commercial & industrial. Offers: Design & installation. Website: https://www.danagrpbd.com/ - Green Textile Unit-3, 733 kWp, Bhaluka, Mymensingh (2024) ([SREDA system #6269](https://ndre.sreda.gov.bd/index.php?id=06&kid=6269)) - Nice Denim Mills, 2.5 MWp, Bhaluka (2025) ([Company website](https://www.danagrpbd.com/project-details/2-5mwp-industrial-rooftop-power-power-plant)) 24. **Solar Construction & Engineering** — 716 kWp across 1 net-metered project in SREDA's records. - Evince, 716 kWp, Gazipur Sadar (2025) ([SREDA system #7353](https://ndre.sreda.gov.bd/index.php?id=06&kid=7353)) 25. **Eclipse Engineering** — 707 kWp across 6 net-metered projects in SREDA's records. A Dhaka engineering and trading firm that has built industrial and institutional rooftop systems. Head office: Banasree, Dhaka. Part of Eclipse Group. Serves: Commercial & industrial, Institutional. Offers: Design & installation, Operation & maintenance. Website: https://www.eclipseengineeringltd.com/ - Siddheswari Cold Storage, 440 kWp, Tongibari, Munshiganj (2025) ([SREDA system #8589](https://ndre.sreda.gov.bd/index.php?id=06&kid=8589)) - Uttara Foods & Feeds, 100 kWp, Manirampur, Jashore (2026) ([SREDA system #9060](https://ndre.sreda.gov.bd/index.php?id=06&kid=9060)) 26. **RS Power & Electric** — 657.5 kWp across 5 net-metered projects in SREDA's records. A transformer manufacturer, founded in 2012, that also installs net-metered rooftop solar. Head office: Khilkhet, Dhaka. Website: https://rspowerandelectric.com/ - 545 kWp system, Gazipur (2025) ([SREDA system #7805](https://ndre.sreda.gov.bd/index.php?id=06&kid=7805)) - 100 kWp system, Gazipur (2025) ([SREDA system #7803](https://ndre.sreda.gov.bd/index.php?id=06&kid=7803)) 27. **Engreen Engineering** — 650 kWp across 3 net-metered projects in SREDA's records. A Dhaka solar EPC firm with three net-metered factory rooftop systems in SREDA's records. Serves: Commercial & industrial. Offers: Design & installation. Website: https://www.facebook.com/engreen.engineering.ltd/ - Aman Fashion & Design, 320 kWp, Savar (2026) ([SREDA system #9568](https://ndre.sreda.gov.bd/index.php?id=06&kid=9568)) - Raya Spinning Mills, 220 kWp, Araihazar, Narayanganj (2024) ([SREDA system #8169](https://ndre.sreda.gov.bd/index.php?id=06&kid=8169)) - Star Graphics, 110 kWp, Savar (2026) ([SREDA system #9573](https://ndre.sreda.gov.bd/index.php?id=06&kid=9573)) 28. **G-Tech Solution** — 547.5 kWp across 2 net-metered projects in SREDA's records. A Dhaka solar EPC firm founded in 2012 with two net-metered systems in SREDA's records. Serves: Commercial & industrial. Offers: Design & installation. Website: https://www.facebook.com/gtechsolutionltd/ - Safar Farms, 290.7 kWp, Shibpur, Narsingdi (2026) ([SREDA system #8898](https://ndre.sreda.gov.bd/index.php?id=06&kid=8898)) - Jamalpur Cold Storage, 256.8 kWp, Jamalpur (2021) ([SREDA system #6725](https://ndre.sreda.gov.bd/index.php?id=06&kid=6725)) 29. **FloSolar Solutions** — 540.36 kWp across 1 net-metered project in SREDA's records. An industrial rooftop solar developer, founded in 2019, offering both outright purchase and power-purchase (OPEX) deals. Head office: Gulshan, Dhaka. Part of FloWater Solutions. Serves: Commercial & industrial. Offers: OPEX / no upfront cost. Website: https://flowaterbd.com/news-media/flosolar-solutions-ltd-launched-as-an-industrial-rooftop-solar-platform-company - Ha-Meem Group Industrial Park, 4.4 MWp, Kaliganj, Gazipur (2024) ([The Daily Star](https://www.thedailystar.net/business/news/ha-meem-group-installs-44mwp-rooftop-solar-power-plant-3814796)) - Ispahani, 540.36 kWp, Gazipur (2024) ([SREDA system #7844](https://ndre.sreda.gov.bd/index.php?id=06&kid=7844)) 30. **Impact Power Pros** — 466.5 kWp across 7 net-metered projects in SREDA's records. An installer with seven small net-metered industrial systems in SREDA's records. - Ezzy Polimer, 200 kWp, Keraniganj (2026) ([SREDA system #9228](https://ndre.sreda.gov.bd/index.php?id=06&kid=9228)) - Star Agro Processing, 75 kWp, Moulvibazar (2025) ([SREDA system #8762](https://ndre.sreda.gov.bd/index.php?id=06&kid=8762)) - Khan Auto Rice Mill, 64.5 kWp, Bagerhat (2025) ([SREDA system #8425](https://ndre.sreda.gov.bd/index.php?id=06&kid=8425)) ## Rooftop Solar Success Stories from Bangladesh Page: https://solargreenbd.com/success-stories · Updated: 2026-10-01 Real rooftop solar projects in Bangladesh — factories, cold stores, universities, government offices and homes — with their size, financing and the results their owners have reported, each linked to its source. Every figure is as stated by the linked source; nothing is estimated. ### Akij Ceramics — 18.69 MWp, Trishal, Mymensingh One of the largest IDCOL-financed rooftop systems in the country. 10 MWp of it is connected to the grid under net metering. (https://solargreenbd.com/success-stories#akij-ceramics) - Sector: Industrial / RMG - Owner: Akij Bashir Group - Date: Inaugurated March 2026 - Financing: IDCOL loan, from a KfW facility - Net-metered: Yes - Yearly generation: 19,500 MWh - Project cost: Tk 101.47 crore - IDCOL loan: Tk 76.83 crore - CO₂ avoided: 14,626 t a year - Sources: [TBS News, March 2026](https://www.tbsnews.net/economy/corporates/akij-ceramics-inaugurates-1869-mwp-rooftop-solar-project-1384971); [New Age, March 2026](https://www.newagebd.net/post/mis/293954/idcol-financed-solar-project-inaugurated-at-akij-ceramics) ### Youngone, Korean EPZ — 16 MW at launch, since expanded, Anwara, Chattogram Bangladesh's largest industrial rooftop system, spread across the roofs of the garment and footwear factories in the Korean Export Processing Zone and expanded in phases. (https://solargreenbd.com/success-stories#youngone-kepz) - Sector: Industrial / RMG - Owner: Youngone Corporation - Date: First phase inaugurated June 2021 - Financing: Self-financed (CAPEX) - Net-metered: Yes - Daily generation: 120–140 MWh - First-phase cost: $16 million - Note: Reported capacity has grown with each phase: 37 MWp (Daily Star, September 2025) and 44 MW (Daily Star, April 2026). - Sources: [TBS News, June 2021](https://www.tbsnews.net/bangladesh/energy/countrys-largest-rooftop-solar-plant-inaugurated-kepz-263728); [The Daily Star, September 2025](https://www.thedailystar.net/business/news/factories-slash-carbon-rooftop-solar-push-3989931); [The Daily Star, April 2026](https://www.thedailystar.net/business/economy/news/solar-powered-factories-weather-energy-disruption-4154671) ### Ha-Meem Group Industrial Park — 4.4 MWp, Kaliganj, Gazipur Part of the garment group's rooftop rollout across its factories. The system covers about four hours of the park's daily power needs. (https://solargreenbd.com/success-stories#ha-meem) - Sector: Industrial / RMG - Owner: Ha-Meem Design Ltd - Date: Commissioned July 2024 - Installer: FloSolar Solutions - Financing: Self-financed, with a grant from an environmental upgrade programme - Net-metered: Not stated - Cost: About Tk 19.6 crore, including a Tk 3.1 crore grant - Note: The Daily Star puts the cost of the group's whole 12.2 MWp rollout at about Tk 54 crore, with about Tk 7 crore in grants. - Sources: [The Daily Star, 2024](https://www.thedailystar.net/business/news/ha-meem-group-installs-44mwp-rooftop-solar-power-plant-3814796); [Textile Focus](https://textilefocus.com/bangladeshs-apparel-giant-ha-meem-group-embraces-renewable-energy-with-rooftop-solar-expansion/) ### Comptex Bangladesh — 3.2 MWp, Rupganj, Narayanganj An early OPEX project. The textile mill paid nothing upfront: Joules Power owns and runs the system and sells the mill its electricity. (https://solargreenbd.com/success-stories#robintex-comptex) - Sector: Industrial / RMG - Owner: Robintex Group - Date: In commercial operation since January 2022 - Installer: Joules Power (owner and operator) - Financing: OPEX — 20-year power purchase agreement; IDCOL lent to Joules Power - Net-metered: Yes - Expected yearly generation: 3.7 GWh - Generated by the operator's count: 9.1 GWh since 2022 - Sources: [Joules Power project page](https://jpl-bd.com/project/robintex-group/); [Bangladesh Post, 2020](https://bangladeshpost.net/posts/joules-power-and-robintex-group-sign-20-years-power-purchase-deal-28898); [Bangladesh Post, 2023](https://bangladeshpost.net/posts/idcol-finances-rooftop-solar-project-of-joules-power-105357) ### Hatil Complex — 2.67 MWp, Savar, Dhaka The furniture maker financed a multi-megawatt factory rooftop system through IDCOL. (https://solargreenbd.com/success-stories#hatil) - Sector: Industrial / RMG - Owner: Hatil - Date: Generating since February 2023 - Financing: IDCOL loan - Net-metered: Not stated - Project cost: Tk 14.23 crore - Sources: [TBS News](https://www.tbsnews.net/economy/corporates/low-cost-rooftop-solar-power-cuts-dependence-grid-841316) ### NAFA Apparels — 234 kWp, Kaliakoir, Gazipur The first site of an energy service company set up with a fashion brand's owner. The factory buys the solar power at a rate below the grid tariff. (https://solargreenbd.com/success-stories#nafa-apparels) - Sector: Industrial / RMG - Date: In operation; work began September 2023 - Installer: Greener Garments Initiative - Financing: OPEX — energy service company co-founded by SOLshare and Heartland, Bestseller's owner - Net-metered: Not stated - Expected yearly generation: 287 MWh - Share of the factory's energy: 20% - Note: SOLshare's 2023 annual report gives the size as 227 kWp. - Sources: [Bestseller](https://bestseller.com/news/first-solar-power-generated-at-bestseller-s-suppliers-factories-in-bangladesh); [SOLshare Annual Report 2023](https://solshare.com/wp-content/uploads/2024/06/SOLshare-Annual-Report-2023.pdf) ### Far East Spinning — 1.1 MWp, Habiganj One of the first IDCOL-financed rooftop systems, connected under the original 2018 net-metering guideline. (https://solargreenbd.com/success-stories#far-east-spinning) - Sector: Industrial / RMG - Date: Inaugurated November 2018 - Financing: IDCOL loan for 80% of the cost, at 6% - Net-metered: Yes - Sources: [Dhaka Tribune, November 2018](https://www.dhakatribune.com/business/161971/idcol-financed-1.1-mwp-rooftop-solar-project) ### Rancon cold storage — 296 kWp, Sadarghat, Chattogram 482 panels on about 28,000 sq ft of roof cover almost all of the fish cold store's daytime demand on sunny days, and the surplus goes to the grid. There is no battery. (https://solargreenbd.com/success-stories#rancon-cold-storage) - Sector: Commercial - Owner: Rancon Sea Fishing Division - Date: In operation since April 2026 - Installer: Rancon Infrastructure and Engineering - Financing: Not stated - Net-metered: Yes - Monthly bill: Tk 6.72 lakh → Tk 2.59 lakh - Monthly saving: About Tk 4.13 lakh - Cost: About Tk 1.3 crore - CO₂ avoided: About 210 t a year - Sources: [TBS News, May 2026](https://www.tbsnews.net/bangladesh/energy/rancon-launches-countrys-first-solar-powered-cold-storage-ctg-1434586) ### Asian Paints Bangladesh, Mirsarai plant — 850 kWp, Mirsarai, Chattogram A paint plant that went solar with no upfront cost, buying the power from the installer under an OPEX deal. (https://solargreenbd.com/success-stories#asian-paints-mirsarai) - Sector: Commercial - Date: Inaugurated June 2026 - Installer: Solaric - Financing: OPEX - Net-metered: Not stated - Expected yearly generation: About 1 million kWh - Note: Figures come from the installer's announcement. - Sources: [Textile Focus, June 2026](https://textilefocus.com/solaric-and-asian-paints-bangladesh-inaugurate-850-kwp-rooftop-solar-power-plant-at-mirsarai-plant/) ### Dutch-Bangla Bank facility — 30 kWp, Baipail, Ashulia, Savar A small, self-funded commercial system, net-metered on the Dhaka Palli Bidyut Samiti-1 network. (https://solargreenbd.com/success-stories#dutch-bangla-bank-ashulia) - Sector: Commercial - Date: Completed October 2025 - Installer: Tawrat Technology - Financing: Self-financed (CAPEX) - Net-metered: Yes - Sources: [SREDA renewable energy database, system #8592](https://www.renewableenergy.gov.bd/index.php?id=06&kid=8592) ### BUET campus — Up to 3.5 MW across 19 buildings, Dhaka The first university in Bangladesh to put solar on all of its rooftops, without spending its own money. (https://solargreenbd.com/success-stories#buet) - Sector: Institutional - Owner: Bangladesh University of Engineering and Technology - Date: Launched June 2024 - Installer: PSL Environment and Green Energy, Genex Infrastructure, Pacific Solar and Renewable Energy - Financing: IDCOL-financed OPEX — no cost to BUET - Net-metered: Yes - Yearly savings: Tk 50 lakh - Savings over 25 years: Tk 12 crore - Share of campus demand: About 10% - Quote: “We will be able to reduce at least Tk 12 crore electricity bills in the next 25 years.” — BUET pro-vice-chancellor, at the launch - Note: Reports give the capacity as 3.5 MW peak or 2.4 MW generating; SREDA lists the systems separately. - Sources: [The Daily Star, June 2024](https://www.thedailystar.net/environment/natural-resources/energy/news/buet-goes-solar-3633991); [TBS News, June 2024](https://www.tbsnews.net/bangladesh/buet-installs-35-mw-solar-project-rooftops-19-buildings-876316) ### Jashore University of Science and Technology — 1 MW, Jashore The university rents out its roofs, buys the solar power at a discount and exports what it doesn't use. (https://solargreenbd.com/success-stories#jashore-university) - Sector: Institutional - Date: Listed by SREDA as completed December 2025 - Installer: Super Star Renewable Energy (investor and installer) - Financing: OPEX, with an IDCOL loan from IFC funds - Net-metered: Yes - Power price: 26.6% below the grid tariff - Roof rent earned: Tk 2 per sq ft a month - Exported to the grid: 24,000–38,000 units a month - Sources: [Prothom Alo English, July 2026](https://en.prothomalo.com/bangladesh/hlc504ofa0); [SREDA renewable energy database, system #9055](https://www.renewableenergy.gov.bd/index.php?id=06&kid=9055) ### Biniyog Bhaban (BIDA headquarters) — 150 kWp, Agargaon, Dhaka BIDA provides the roof; the utility DESCO pays for and runs the system. BIDA takes 10% of the power, and DESCO keeps 90% and any carbon credits. (https://solargreenbd.com/success-stories#biniyog-bhaban) - Sector: Institutional - Date: Operating by June 2026 - Installer: DESCO (investor and operator) - Financing: OPEX under the National Rooftop Solar Programme - Net-metered: Not stated - Generation: About 15,000 units a month - Yearly earnings: Tk 14–15 lakh - Expected payback: 3.5 years - CO₂ avoided: 150–180 t a year - Note: BSS reports an investment of about Tk 50 lakh; BIDA's announcement gives Tk 89 lakh to install plus Tk 87 lakh for 20 years of maintenance. - Sources: [BSS, June 2026](https://www.bssnews.net/special-stories/398467); [BIDA, September 2025](https://investbangladesh.gov.bd/press-release/bida-desco-sign-mou-to-install-150kwp-rooftop-solar-system-at-biniyog-bhaban) ### Deputy Commissioner's Office, Sirajganj — 150 kW, Sirajganj At the inauguration, the minister said the government would replicate the "Sirajganj model" on public buildings elsewhere. (https://solargreenbd.com/success-stories#sirajganj-dc-office) - Sector: Institutional - Date: Net-metered from July 2026 - Installer: Pristine Crossing Point, with technical support from NESCO - Financing: Government-funded, through the Cabinet Division - Net-metered: Yes - Cost: Tk 71.26 lakh - Sources: [BSS, July 2026](https://www.bssnews.net/news/406588); [Energy Bangla](https://energybangla.com/150-kw-rooftop-solar-power-plant-installed-at-sirajganj-dc-office/) ### Medical College for Women & Hospital — 60 kWp, Uttara, Dhaka A private hospital and medical college with a self-funded, net-metered system on the DESCO network. (https://solargreenbd.com/success-stories#medical-college-for-women) - Sector: Institutional - Date: Completed March 2026 - Financing: Self-financed (CAPEX) - Net-metered: Yes - Sources: [SREDA renewable energy database, system #9176](https://www.renewableenergy.gov.bd/index.php?id=06&kid=9176) ### A Dhaka apartment — 2 kW, with batteries, Mirpur, Dhaka The owner installed a small battery-backed system to rely less on the grid, and plans to add another 3 kW. (https://solargreenbd.com/success-stories#mirpur-apartment) - Sector: Residential - Date: Reported July 2026 - Financing: Not stated - Net-metered: Not stated - Cost: Tk 2.7 lakh - Monthly bill: Tk 4,000–4,500 before; about Tk 2,500 lower after - Sources: [Prothom Alo English, July 2026](https://en.prothomalo.com/bangladesh/hlc504ofa0)